Define the sample goal.
Then plan the next step.
A sample should answer a specific question. Define what to verify, the consumables and evaluation method before agreeing the version, costs, quantity and timing.
From requirements to delivery, with clear checkpoints.
Share requirements and objectives
Share the model, consumables, conditions and the question the sample should answer.
Agree at this stageModel or design direction; evaluation goalsAgree sample scope and arrangements
Discuss branding or structural changes, then agree costs, quantity, scheduling prerequisites and expected timing.
Agree at this stageSample version, terms and schedulePrepare and deliver samples
Arrange the sample against the agreed scope and confirm accompanying information and shipping requirements.
Agree at this stageSample identification, records and delivery methodEvaluate, report and refine
Evaluate under the agreed conditions and record observations and data. Any changes require an updated scope and schedule.
Agree at this stageFeedback record and revision decisionAgree the order and delivery
Once the sample design is agreed, discuss order quantity, production arrangements, packaging and acceptance records.
Agree at this stageOrder terms and delivery checklist
Why is timing
project-specific?
Your required arrival date is a useful target. The schedule also needs to account for the following conditions.
- Product and changes
- Catalogue products, branding changes and new designs involve different work.
- Information and consumables
- Readiness of drawings, brand files and evaluation consumables.
- Samples and feedback
- Sample scope, evaluation arrangements and any revisions or rechecks.
- Production and shipping
- Quantity, materials, production scheduling, packaging and destination.
Before sampling,
align the terms.
Agree sample arrangements and subsequent orders separately.
Are samples free?
When does the lead time start?
What if changes are needed after evaluation?
Tell us what the sample needs to answer.
Share the model, application, consumables and target timing to discuss sample arrangements.